A B C D E F G H I J K L M N O P Q R S T U V W X Y Z
 
Term Expansion Equivalent
AIAG Automotive Industry Action Group
Annualised Production Volume This figure represents the annual volume assuming that the maximum monthly requirement in the year was required in every month.
APQP Advanced Product Quality Planning
KSES Kasai Supplier Evaluation Standard
ASIL Automotive Safety Integrity Level
TOP
Term Expansion Equivalent
BOM Bill Of Material
Bottleneck A process constraint which limits the throughput of the total facility
TOP
Term Expansion Equivalent
CAD Computer-Assisted Design
CAE Computer-Assisted Engineering
CCR Concern & Countermeasure Request 8D-CCR
Child Part Sub-assembly or sub-component (e.g. Head lamp of front end module)
CKD Complete Knock Down
Control Plan Control Plans are written descriptions of the systems for controlling parts and processes. Plan de surveillance
Component marking Component marking includes any marking that is made on the product to aid identification of the product. Typically this includes part number, Material type, traceability identification.
Countermeasure Corrective action
Cp/ Cpk Process Capability Index
CSCC Component Supply Chain Chart
TOP
Term Expansion Equivalent
DCI Document Completion Instruction
Design Assurance Plan (DAP) This is a requirement of KSPQP and applies specifically to a new product development programme of the supplier
DFA/ DFM Design For Assembly/ Design For Manufacture
DFMEA Design Failure Mode and Effects Analysis - An analytical technique used by a design responsible engineer / team as a means to ensure, to the extent possible, that potential failure modes and their associated causes / mechanisms have been considered and addressed.
DRBFM Design Review Based on Failure Mode
TOP
Term Expansion Equivalent
EDI Electronic Data Interchange
TOP
Term Expansion Equivalent
FEA Finite Element Analysis
Firewall Activity to prevent outflow of defects, including 100% inspection
FMEA Failure Mode & Effects Analysis AMDEC
FTA Fault Tree Analysis
TOP
Term Expansion Equivalent
G
TOP
Term Expansion Equivalent
TOP
Term Expansion Equivalent
IMDS The International Material Data System is the automotive industry material data system.
TOP
Term Expansion Equivalent
J
TOP
Term Expansion Equivalent
KD Knock Down
Key Features Features which have significant effects upon Fit, Function, Performance and Reliability
Or
Features which require assurance or control during production with regard to Fit, Function, Performance, Reliability, Appearance, and Serviceability

Key features are quite different from, and should not be confused with, Special Characteristics.

These features can be identified by the supplier and Kasai UK..
TOP
Term Expansion Equivalent
LVPM Local Vendor Packaging Method DCL
TOP
Term Expansion Equivalent
Mass Production Production after SOP Serial Production
Module A complete functional assembly inclusive of sub-module parts as defined by the customer.
MRD Material Requirements Date
MSA Measurement Systems Analysis
TOP
Term Expansion Equivalent
NCDR Non-Conforming Delivery Report
NCMAR Non-Conforming Material Action Report
TOP
Term Expansion Equivalent
Off-Process Condition where parts produced using the production tooling and production process
Off-Tool Condition where parts are produced using production tooling
TOP
Term Expansion Equivalent
PPAP Production Preparation Approval Process
PPM Parts Per Million
PPMM Production Preparation Monitoring Meeting - The meeting at which Kasai UK will confirm the Supplier status against the Supplier Plan.
PSW Part Submission Warrant
TOP
Term Expansion Equivalent
QCD Quality, Cost, Delivery
QFD Quality Function Deployment
TOP
Term Expansion Equivalent
RFQ Request For Quotation
RKD Reverse Knock Down
RPN Risk Priority Number IPR
TOP
Term Expansion Equivalent
SDTR Supplier Digital Test Report
Service Parts Replacement parts required for after-sales support
SOP Start Of Production
SPC Statistical Process Control MSP
Special Characteristics
STR Supplier Test Report MSP
STRS Supplier Test Report System MSP
TOP
Term Expansion Equivalent
TPM Total Preventative Maintenance
TOP
Term Expansion Equivalent
U
TOP
Term Expansion Equivalent
TOP
Term Expansion Equivalent
W
TOP
Term Expansion Equivalent
X
TOP
Term Expansion Equivalent
Y
TOP
Term Expansion Equivalent
Z
TOP
 

© Copyright 2016 Kasai UK